Wind Generator and Wind Generating Facility Ordinance for Trempealeau County

Posted on December 18, 2007. Filed under: 1 mile setback, Bruce County, Canadian wind farms, Canadian wind industry, Carol Mitchell mpp Huron Bruce, Dalton McGinty wind energy, David Suzuki Foundation, Enbridge wind farm, Enbridge wind farm in Kincardine Ontario, Environment, Epcor wind farm Goderich, Essex, Essex wind farm, Kincardine news, Liberal Party of Ontario, Melancthon II wind farm, Ontario wind energy, Ontario wind farms, Suncor wind farm in ripley Ontario, Trempealeau County, Wolfe Island, epcor wind farm Kingsbridge, truth about wind farms | Tags: , , , |

Editor:
Reading the letter below showed me the real life problems associated with wind farms being sited too close to homes. That was just over a year ago. Anyone trying to convince any level of govt knows the frustration they have endured in their fight for reason. Mr. Monfils warned us and it seems fitting that the first realistic, not perfect, setbacks in North America should be passed in Mr. Monfils State of Wisconsin

This letter was written by Mr. Monfils, Lincoln Town Board Chairman, about living near wind turbines in Kewaunee County, Wisconsin. He wrote it hoping that it will help other communities facing wind power plant proposals. problems-associated-with-wind-turbines

Please make sure everyone gets a copy of this new ordinance

Wind Generator and Wind Generating Facility Ordinance for Trempealeau County

Setbacks: The following setbacks and separation requirements shall apply to Commercial Wind Turbines.
(a) Public Roads: Each Wind Turbine shall be set back from the nearest public road and its right of way a distance no less than two (2) times its Total Height.
(b) Railroads: Each Wind Turbine shall be set back from all railroads and their right of way a distance of no less than two (2) times its Total Height.
(c) Wind Turbine spacing: Each Wind Turbine shall have a separation distance from other Wind Turbines equal to one and two-tenths (1.2) times the total height of the tallest Wind Turbine.
(d) Communication and electrical lines: Each Wind Turbine shall be set back from the nearest above-ground public electric power line or telephone line a distance no less than two (2) times its Total Height.
(e) Inhabited structures: Each Wind Turbine shall be set back from the nearest structure used as a residence, school, hospital, church, place of employment or public library, a distance no less than one (1) mile, unless mitigation has taken place and agreed by owner/operator and affected property owners involved and recorded in the Trempealeau County Register of Deeds office which describes the benefited and burdened properties and which advises all subsequent owners of the burdened property.
(f) Property lines: Each Wind Turbine shall be set back from the nearest property line a distance no less than one-half (½) mile, unless mitigation has taken place and agreed by owner/operator and affected property owners involved, and recorded in the
Trempealeau County Register of Deeds office which describes the benefited and burdened properties and which advises all subsequent owners of the burdened property.
Click link to read complete document.

wind_ordinance doc

Make a Comment

Make A Comment: ( 1 so far )

blockquote and a tags work here.

One Response to “Wind Generator and Wind Generating Facility Ordinance for Trempealeau County”

RSS Feed for Blowing Our Tax Dollars on Wind Farms Comments RSS Feed

Fond du Lac County was the scapegoat. We were doubly screwed. At least someone gained from our loss.

Mike Winkler
December 19, 2007

Where's The Comment Form?

Liked it here?
Why not try sites on the blogroll...